Multi-modal Work Products

  • List of pre-qualified sites, with datasets and GIS parcel maps.
  • Feasibility study report, containing site evaluations, rankings and recommendations.
  • Land use analysis and plan, and preliminary site plan of freight transfer facility and manufacturing park, showing desired highway upgrades as needed.
  • Preliminary engineering.
  • Survey data
  • Aerial photos
  • EAF Phase 1
  • Soils report
  • GIS Maps
  • Strategic Development Plan
  • Notes on public meetings.

   